Charrette |
At the beginning of the project, collaboration of all project stake holders joined the discussion about how to develop environment-friendly project |
|
Restoration of Woodland |
Originally hilly woodland
spread around here. in a different place during construction. Then the trees were put back ! |
|
Construction Phase - Under Construction |
||
Construction Site |
Environmental education to the construction workers at the first stage |
|
Bicycles are used to move within the construction site
|
||
Use of construction machinery that emits less exhaust gas and noise |
||
Construction wastes sorting to recycle
|
||
Spreading excavated soil in the site
|
||
Collecting micro climate data on site by measuring the temperature, humidity, earth temperature and rainfall in order to make use of it |
||
Use of steel deck instead of rainforest wood for form board
|
||
Delivery with minimum packing
|
||
Utilization of harvested rainwater for cleaning, washing cars and flushing toilet. |
||
Use of energy saving equipments for the on site house |
||
Photovoltaic system |
Foundation base is provided on the roof for photovoltaic panels
|
|
Recycling system of gray water |
Piping (colored pink) is provided forthe future adaptation |