Process of Green Development in detail

Design Phase

Charrette

At the beginning of the project, collaboration of all project stake holders joined the discussion about how to develop environment-friendly project

Restoration

of Woodland

Originally hilly woodland spread around here.
 One day a decision to develop this woodland was made to construct buildings.  What happened to many trees around here?  Those trees were temporarily planted

in a different place during construction. Then the trees were put back !

Construction Phase - Under Construction

Construction

Site

Environmental education to the construction workers at the first stage

Bicycles are used to move within the construction site

Use of construction machinery that emits less exhaust gas and noise

Construction wastes sorting to recycle

Spreading excavated soil in the site

Collecting micro climate data on site by measuring the temperature, humidity, earth temperature and rainfall in order to make use of it

Use of steel deck instead of rainforest wood for form board

Delivery with minimum packing

Utilization of harvested rainwater for cleaning, washing cars and flushing toilet.

Use of energy saving equipments for the on site house

Preparation for the future

Photovoltaic system

Foundation base is provided on the roof for photovoltaic panels 

Recycling system of gray water


Piping (colored pink) is provided forthe future adaptation